Bridge Project in Oromia
Project Overview
Engineered to withstand seasonal flood surges and heavy regional freight traffic, this 120-meter multi-span girder bridge replaced an old temporary crossing, reducing transit times by 65% for local farmers and industrial transporters.
Heavy reinforced concrete bridge connecting key agricultural zones and rural communities across the Awash river basin.
Project Deliverables
Project Gallery
2 Photos
Related Projects
View All →
Hawassa Industrial Link Road & Overpass
Heavy-duty industrial park access road with reinforced concrete bridge overpass and drainage network.
Sheger Water Management & Urban Green Drainage
Urban riverbank rehabilitation, retention reservoirs, and eco-friendly stormwater drainage channels.
Heavy Machinery & Construction Trading Depot
Depot facility and supply chain trading operation supplying high-grade steel, rebar, cement, and heavy construction equipment.